PROJECT DESCRIPTION

In support of a greenfield coal mine development MDCC undertook the design and construction of a man camp facility and a 78 kilometer access road to ENRC’s north shore coal concession. Design including masonry and steel building structures and the civil design of the tertiary access road. The logistical support of fuel and food supplies was added to our SOW after commencement of contract and was maintained for an 18 month period.

CONTRACT INFORMATION
Offeror MDCC Holdings
Past Performance Contract Number North Shore Main Camp and Access Road
Performed as Prime or Subcontractor Prime
Client Eurasian Natural Resources Corp. – A FTSE 100 Mining Firm
Project Location(s) [State or Country] North of Lake Cabora Bassa near Zambia Border, Tete Province, Mozambique
Number of Full-Time Project Personnel 25
Technical, Cost or Schedule Problems Encountered and Resolution Logistics plan had to change when the sole barge supplying goods to the north shore camp operated by another company sank. The use of helicopter to bring in all food goods and overland off-road transport for fuel and other heavier materials was employed.
Solutions Applied, Cost-Savings Realized or Recognition Received None
Actual Results Achieved against Performance Standards: Project was completed on-time and on-budget
Original Annual Contract Value $1.083 million
Current Annual Contract Value $1.225 million
Explanation of Variance if applicable Added camp support to additional SOW
Period of Performance November 2011-October 2012
Contract Type (Firm Fixed Price, Time and Materials, Cost Plus, etc.) Firm Fixed Price